SYNCHRONIZED LIFTING

SYNCHRONIZED LIFTING

Through the expertise of its technicians and cutting-edge equipment, Sirtec is able to rent hot EVO synchronized lifting systems capable of controlling any cylinder by checking in real time all the lifting parameters available.

our interventions

Main Crane lift ship

Lifting of the viaduct in the Barberino del Mugello area

Lifting of the viaduct Valbona Molinazzo on the A6 Highway

WhatsApp Image 2021-07-01 at 08.16.21

Lifting of the bridge on the Piota river in Comune di Tagliolo Monferrato (AL)

Sollevamento sincronizzato Ponte Piota

The article erroneously states ‘It is the same company that intervened to dismantle part of the Morandi’, but for the sake of correctness we would like to point out that our company did not work on the Morandi Bridge.

Other lifting

A6 Highway

Lifting carried out during the maintenance and modernization of the viaducts Viaducts.

for information

SIRTEC s.r.l.
via Borzoli, 39
16153 GENOVA (GE) - ITALIA

phone +39 010 6503836
fax +39 010 6505609
info@sirtecsrl.com

en_GBEnglish
Chiama ora